山西

Aug 02 2010

美國大學生到訪山西省王文嶺村植林區

Published by chia under 王文嶺

美國大學生 到訪山西省 王文嶺村 植林區

2010530美國聖母大學(University of Notre Dame)學生到訪記錄

 

1.      Dr. Noble 作出最後決定,學生不在農民家中渡宿一宵。

2.      今次行程,美國學生乘坐火車由北京出發,在29晚上9:30到達太原,一行共21(包括了美國領隊Dr. Noble及北京學生中心趙先生(Mr. Justin Chiu)協助),而林科院鄺院長和香港一班義工(包括Mrs. LoLilian KwokTennyson Chan及我)在太原火車站等侯這團隊,然後一齊前往酒店入住。

3.      530日早上我們租了兩輛旅遊巴士往王文嶺出發,我們與學生們一齊前往植林區爬山後,中午在村民家中吃午飯,學生們對這次到王文嶺的行程感到非常奇妙及甚感興趣。

翌日早上我們到山西博物館參觀,他們在531日下午2:OO踏上回程前往北京。

4.      我認為這一次訪問很成功 :

a) 行程運作暢順

   b) 所有參與者有積極回應

   c) 在王文嶺進行家訪,我們盡一點小心意,給予每家農民200元人民幣(這次

      安排了五家農民,每戶負責招待4- 6名學生),另美國聖母大學捐贈了一

千元人民幣作為全村的禮物現金,感謝他們的熱誠款待。

   d) 美國聖母大學駐北京的趙先生考慮會安排北京的大學生再度訪察。

5. 方金海給我們匯報了一個好消息,就是往年種植存活了的7000株樹的生長

極佳,總存活率保持60-70%

6. 另我們與村長及兩位村委,一齊在村長家中午膳,大家閒話家常;他們表示非常歡迎大學生的到訪,在談話中提及希望在我們能力範圍內,協助幫忙解決現有用水源不足的問題。

7. 村長方海金提出討論今年管理樹木的方案,但由於時間太緊拙,美國學生要準備起程離開;所以今次沒時間去商討,我只能回應他,鄧錫英醫生暫定會在7月份來訪,到時會和他約時間商議一切,現由基金會每月支付100元人民幣(以一年十二個月計算,每個月支付),用作冬天保護林木之用。

 

總括而言,今次安排美國大學生到訪王文嶺,帶出正面的回響;亦為我們基金會在植林實驗開展了新的一頁,使學生除了體驗當地農民的生活,亦引導學生了解對保護生態環境的重要性。

 

莊厚明醫生

201062

 

 

 

 

 

# It is to report about the recent Wong Man Ling visit by the students from University of  Notre Dame to WML on 29th May.,2010
1. Due to final decision of Dr. Noble, the students were not staying in the villagers’

 home overnight
2. There was a group of 21 including Dr. Noble and Mr. Justin Chiu from Student

Centre from Beijing helping to arrange the travel of the students. They travelled by

train from Beijing in the afternoon and arriving Tai Yuan at 9:30 pm. 29th June.
    Mr. Kwong and the HK volunteers ( Mrs .Lo, Lilian Kwok , Tennyson Chan and I)

went to the Tai Yuan train station to bring them to the hotel
.3, We rent two bus to travel to WML on 30th May in the morning and took lunch

 with the villagers after hiking in our plantation site.
    Students were very cooperative and interested in the WML visit. They visited the

Shanxi Museum the next morning before they returned to Beijing on 31 st May 2pm.

4. This visit is a successful in my view in term of :-
   a)  Smooth and safe running of the visit
   b). Positive response by all participants
   c). Villagers of WML had some financial input ( We had arranged a lunch fee of

RMB 200 each for 5 families hosting 4-6 students , the university of  Notre

 Dame also arrange a donation of RMB 1000 to the whole village as a gift to

 thank their helping in the visit.)
   d). there may be future visit arranged by Mr.Justin Chiu for university from Beijing

 to the plantation as a similar study tour as this one.
5.  Fong Kam Hoi had reported a good growing status of the trees and claiming the

 number to be around 7000 and survival rate of  60-70% 
6.  We had lunch with village party secretary and two other officers in the village

 head’s home. We had very good communication and they had showed welcome

attitude to the students’ visit. There is however a rise for help to solve the water

shortage problem in the village  by one officer but there is no pressure or forceful demand in his request for help.

7.        The village head ( Fong Hoi Kam) wanted to discuss the management of the trees

 for this year but it cannot be done due to short time for the students are leaving

already. I replied him that Dr.Tang will deal with it in July. It would be then

about time to pay the village for this year’s  management fee ( RMB 100

 monthly for 12 months) and money for the winter protection of trees.

Generally speaking , this visit had opened a new role that our foundation can play in the plantation site of WML besides as an experimental site that kept for our own inspection

 

 

Comments Off

May 05 2010

山西四月行日誌

Published by chia under 山西, 王文嶺, 石樓, 義工, 項目

 

山西四月日誌 (2010436)

 

第一天

 

由尖沙咀乘坐跨境巴士到深圳機場直飛太原。關永光醫生,葉榮根先生,高志豪先生,莊厚明醫生及太太和兒子,相約在太原機場集合。是日下午五時飛機降落在太原機場,當大家下機後立即乘車出發前往石樓,在高速公路上的休息站,約用了大概半小時進食晚飯,終於在晚上九時半到達了石樓。

 

第二天

 

我們花了整個早上及下午徒步巡視了在四江村的植林區。在第一期植林區中,由施永青先生捐贈的樹苗,現已生長成為12-15呎高的樹木 (1)

雖然在寒冬中樹木落掉了樹葉,但因這些樹坑是用松樹皮覆蓋,泥土即使挖深了數寸,仍然保持了濕潤 (2)

因在每個樹坑中所種的3棵樹苗大都生存,故其存活率應超過90%

 

我們沿着山路檢視了其他植林區域。而在去年春天在170畝耕地上所種植的樹苗,因路途太遠而未能徒步前往,故我們只好在山頂上遠眺瞭望(3)

我們亦見到根據當地農林部研究院長鄺先生建議方法種植的20畝耕地植苗樹坑( 一半是晶苑集團資助  ) (4左方的葉子形狀田地)

依照這季的樹苗成長,在樹坑中生長的樹苗,正常是看不到有樹葉發芽現象的。但幸宜在樹皮底下都是存在綠色的生機(5)

 

文斌報告了一個令人憂慮的問題,在上年度補種的苗有8000棵,很不幸的其中有2000棵桑樹的根部,被土老鼠咬壞因而枯萎( 6)

原因是大量種植桑樹及其甜根部,所以吸引了這批不速之客到來進行破壞。我們立即和有關人士討論如何能盡早解決這嚴重問題,村長的建議是用胡蘿蔔混入毒藥滅殺這些地下老鼠。但我們很希望能找出最佳的方法,採用有效的根治去控制鼠患及保護植林區的樹木成長。土老鼠的天敵如貓頭鷹亦可考慮。

 

在第六段荒地上所種植的樹苗生長良好,令人喜出望外。文斌告知除了在一小部份地區的斜坡上所種的樹苗,需要補苗外,其他的存活率超過85%。在未來一年部份補苗的成長仍需在觀察中。在第一期及第二期植苗240000棵,只需補苗20000棵。現在第三期第一階段在170畝耕地植苗35600( 一半是晶苑集團資助  ) ,成長存活率有待觀察。去年冬天下雪後,雪水濕潤了樹坑,這是一個好消息。

 

我們被村長邀請到他家中午膳後,關永光醫生,葉榮根先生和我一齊攀登上第六區,檢視了該區的植苗生長,情況和去年相約,只是未曾發葉( 7)

凌友詩和高志豪同時去了解一間由當地政府所建的小房屋( 8)

內有水井準備供應村民家,後因財政不足而停止連接水管,村民要走很遠路來打水。凌友詩決定個人經基金會捐獻約人民幣七千元資助村民完成工程。隨後由當地政府安排我們到訪了當地建築中的老人院及孤兒院,希望我們了解現有的狀況(9)

文斌很強調,他們不是要求我們施出援手而加重基金會的財政壓力,而是希望我們能協助他們把訊息傳遞給有興趣及有能力的組織。支持他們重建老人院及孤兒院的計劃。整個計劃的支出預算為七百萬人民幣,而政府已批出資助金五百萬人民幣,餘數則希望能有善心人士或組織出資完成計劃。我們口頭上應允會盡力幫他們將訊息傳遞,但不保証會有任何結果。

 

當天晚上,當地政府鎮書記和林業部等各要員宴請了我們一起共進晚餐。我們在席上獲當地政府再承諾會全力支援當地植林的工作。

 

 

第三天

早上在石樓賓館舉行了第三期第二階段450畝荒地上植樹的簽約儀式,出席包括了當地的黨委書記,林業部負責人等各要員。合約是以力行植林慈善基金會(GACF) 和林業部簽署,文斌預算計劃在今年內會種植樹苗58500(10)

 

其後我們前往連接山西與陝西的黃河大橋參觀(11)當地業林部已向政府有關部門在這裡申請以力行植林慈善基金會形式去種植生態林,但仍有待批准。我們遠眺了黃河附近已有種植30年的植林區(12)

我們和當地官員一起午膳,多謝他們的熱誠款待及對我們基金會植林的工作無限量的支持。

 

我們於下午2:30離開,經過四個多鐘頭的車程回到太原。我們相約了鄺立剛先生一起晚餐,在席上大家討論了我們在山西植林的工作。他對我們植苗存活率比其他地方種植為高,給予我們很高的評價。這可能是本地投放的種植資源有限所引致,但據聞這方面已有改善,例如每畝投入的金額已由80元人民幣增加至200元人民幣。我們亦提出很樂意在適當場合或時機,與有關人士互相交流種植樹木的經驗,希望對山西植林作出有效用的參考。

 

第四天

 

早上八時許出發,我們約在九時半到達王文嶺。關永光醫生和葉榮根先生登上了山峄上,檢視了王文嶺樹木的成長,與上年度相比差距不多。莊厚明醫生則負責到訪當地村委,討論種植及管理問題。根據村委的報告,莊醫生確認他們作出努力不懈,使樹木生長狀況良好。在今年冬季種植樹苗的有關計劃,將會在本年度8月份作出預算。此外,莊厚明醫生向村委提出聖母大學(University of Notre Dame)的大學生會在本年度5月尾左右到訪王文嶺,希望能體驗當地的生活。村民們都很高興接受這批外國大學生在他們家中渡宿一宵,同時希望藉此訪問作出中西文化交流的好機會。當我們在村民家中吃過午飯後,約在中午12:30啟程到太原機場,正式結束了這次的行程。

 

Shanxi April Visit Diary (3rd to 6th April 2010)

 

 

Day 1 Travel to ShekLau

 

     Dr. Kwan, Albert Yip, Eddy Ko and Dr. Chong’s family met together in Taiyuan Airport and travelled directly from TaiYuan airport to ShekLau at 5pm . The group arrived at ShekLau at about 9:30 pm. We took our dinner for half an hour at highway rest station.

 

 

Day 2 Inspection in ShekLau

 

     We walked up the plantation areas in Four River village in the morning and afternoon. The phase I area, especially the area donated by Mr. Shih, is now well occupied by tall trees about 15- 20 feet high (photo 1). Although the trees had shred their leaves in winter, the soil in the tree trenches were wet (photo 2) after removing the pine tree bark cover and dug out for few inches. The estimated survival rate in that area is more than 90 % as all three trees in on trench grew.

     Other parts of the plantation site were inspected when we walked up to the top of the mountain (photo 3). Though we could not walk up to the farthest site which is the 170 acres of land planted in last spring, we could see with nude eyes the tree trenches dug and the area that represent the 20 acres of land( photo 4) planted with Mr. Kwong’s method (Deputy head of the local forestry research institute). There were no leaves budding up at that season yet but the green stem underneath the tree bark had shown surviving trees.( photo 5)

     One worrying discovery is that ManBen had reported an overall 8000 sapling replacement plantation last year in which 2000 young trees were damaged by a kind of underground rat (photo 6) which ate the sweet root of mulberry(桑树). It is a new threat that never met before as there were no such trees in that amount before to attract the rats. We had discussed the ways of treating this problem promptly and poison mixed in carrot to kill the rats was suggested to the local village head and will be tried. We need further investigation of an effective measures to control the rats! [one alternative was the introduction of predator e.g. owl]

 

     The trees planted in the bare land in area 6 also grew well out of the expectation of Man Ben though there was a small area of slope which didn’t do well and needs supplementary plantation. The overall survival rate as reported by Man Ben is still more than 85% for all the trees planted.

 

 

 

 

 

 

Some trees planted supplementary still need observation for their survival in this coming year but the total supplementary trees planted so far in past years only amount to 20,000 compared with the 240,000 trees planted in phase I &II. The 35,660 trees planted in 170 acres of land in stage I of phase 3 ( Half funded by Crystal Group)  needed monitoring this year for survival but the moderate snowing last winter is good for water supply when the snow melt in the tree trenches.

 

     We took dumpling lunch provided by village head in his home and Dr. Kwan, Albert and Dr. Chong climbed up and inspected area 6, the saplings are about the same as last August though there are no leaves now.(Photo 7) Grace Ling and Eddy visited a water supply house (Photo 8) partially finished by the government in which a well was dug to get water supply. There was however inadequate money to finish water pipe line connection to each house of the village and villagers needed to get water daily from it walking long distance. Grace Ling decided to donate the cost about RMB 7000 through the foundation to help finish the pipeline construction. We then all left for the elderly home and youth centre building planned by local home affair bureau to understand their suggestion (Photo 9). Man Ben stressed that they don’t want to pressurise our foundation on the financially support to the three planned & newly built blocks for caring of poorly old villagers and orphans. They just hoped that we can bring their needs to those interest and capable groups to support their building block which is now in progress of construction and further needs of a RMB 7 million support while 5 million was financed by the government already. We agreed to try our best as far as possible without any guarantee to any definite results.

     At evening we were invited by the local home affair bureau (民政局) officials for dinner which were attended by local forestry department head and local county head. We were once again promised by full support from the local government about the plantation work of our foundation.

 

 

 

Day 3 Formal Ceremory for Signing Contract

 

Early morning we had a formal ceremony in the conference room of the ShekLau Guest House to sign up the phase III stage 2 plantation work of the 450 acres of bare land. It was attended by the local forestry heads including the party secretary and forestry department head. The contract was signed by the GACF and the local forestry department with Man Ben to plant the 58,500 trees this year. (photo 10)

 

We played a short visit to the yellow river where a bridge is now being built to connect Shanxi and Shaanxi (photo 11). The local forestry department had applied a project for plantation work there using the plantation method by the Green Action Charity Foundation but is still pending for approval. We also inspected a distant local forest nearby the yellow river, which were planted for more than 30 years (photo 12). We had lunch with the local county head whom had once again showed his full support to our foundation’s work and his hospitality.

   

     We left for TaiYuan at about 2:30 pm and arrived after 4 hours of travel.

 

     We had dinner with Mr. Kwong Lap Gong and discussed about all aspects of our plantation works which he had appraisals on our survival rate compared with local methods which had a very low input per acres. There was however said to have a change to higher input per acres these years from RMB 80 to RMB 200 and we agreed that we might need to make some suggestions according to our experience to some relevant officers at appropriate time afterward. The main theme will be to improve information exchange and hopefully to give useful reference for a better plantation results in Shanxi.

 

 

Day 4, Visit to Wang Wen Ling Site

 

We travelled early 8:00am to Wong Man Ling and arrived there at about 9:30am. Dr. Kwan and Albert Yip climbed up the mountain to inspect the existing trees and reported a similar survival of trees compared with last year.

     Dr. Chong had an interview with the local villagers and village head to discuss the plantation management which is now under the village committee and confirmed their continued effort to maintain the trees in good condition.

     There is no more need so far for management of the planted trees and winter management cost will be planed in August. Dr. Chong also discussed the end of May visit by the university students from University of Notre Dame. The villagers were very glad to be the guest home for the foreign students for one night. We all hoped that the visit can be a good time for interflow of the east and west. We had lunch with the local villager in his home and then left at 12:30 noon to the airport.

 

 

 

         

Comments Off

Nov 02 2009

石楼县林业局 文斌

Published by chia under 山西, 植林, 石樓

荘医生你好:
今秋我县雨水较多,墒情较好,目前正是植树的有利时机,随着我县今秋造林工作的全面展开,我于10月24日也开始今年工程的下苗工作。但由于最近工作较忙,一直没有电邮给你们。现将近期工作及所需费用报告如下:
一、苗木筹备情况
1、根据以往几年树木成活及生长情况,我主要选择槐树、火炬、椿树,但今年椿树苗没有合格苗,只选了火炬、槐树。
2、根据当地连年少雨的特点,今年选择即耐旱,又是一种能源产品的文冠果。同时选择少量的仁用杏,具体情况是:
①刺槐:18000株×0.3元/株=5400元
②文冠果:9000株×3元/株=27000元
③火炬:4000株×4元/株=16000元
④仁用杏:2000株×2元/株=4000元
共计52400元
二、20亩地按邝院长的方法植树,目前已基本完工,共需费用18880元。

三、其它费用10000万元:(1)给李慧资助款4000元;(2)办理土地证2000元;(3)工程碑简介4000元。
以上共计费用81280元。
今秋我把前二年植树地块全部检查,对苗木不足的地块进行了补栽,整个植树覆盖松树皮估计11月中旬全部完工,请基金会的朋友们放心。

石楼县林业局 文斌
二00九年十一月二日

附:近期工程图片

Comments Off

Oct 15 2009

山西工作簡報

Published by chia under 山西, 植林

石樓(2009年6月- 8月) 及計劃( 9月– 11月)
植林方面:
09年6月- 8月:
1. 第一期,250畝,苗木情況:已植樹112300株,苗木生長旺盛,是普通方法植树的1.5倍。
2. 第二期, 385畝,苗木情況:已植樹127000株,苗木成活达90%。
3. 第三期, 170畝,於8月5日與林業局簽訂承包植樹35660株合同,并準備规划荒地450亩,三年内完成。
4. 於8月5日,一行16人到達石樓,與林業局,鎮政府等官員溝通, 獲承諾支持植树、教育、医疗等公益事业。

計劃9月– 11月:
1. 第三期植林的前期準備:打樹坑,混稻殼,回土.預算由9月開展, 約10月完成,11月根据墒情进行栽植,覆盖松树皮。
2. 割草: 第一,第二期的割草由 4月展開,約9月完成
3. 施肥:每坑施农家肥(鸡粪)1公斤。

助學:去年已资助中学生14名,资助金额44000元,今年獲鄧醫生承諾计划资助大学生一名。

王文嶺(2009年6月 – 8月) 及計劃( 9月 - 11月)
苗木管護:
09年6月 – 8月:
1. 苗木生長情況理想,存活和去年一樣。零五年至今約五成。
有當地長者稱有六成。
2. 管護續由村委負責,並將用兩千元塗油防冬天野兔咬樹。
3. 於8月8日.一行15人,到現場視察, 並和村委開會明確責任。

計劃9月 – 11月:塗油防冬天野兔咬樹。

關於有意在香港學校作植樹宣傳的進展
在2009年7月13日舉行了學校宣傳小組第一次會議(詳情可參閱會議記
錄),會議上已有義工聯絡了學校校長,希望盡快將相片剪輯製成海報到各學校作出宣傳,亦希望能邀請專業人仕到學校進行講座。故需要更多義工支持及進行培訓。最新已選出部分相片供需王德富千金製作展板,正進行中。另亦準備邀請英皇中學部份老師參予植樹宣傳活動,亦已答出席。

其他:–
視察行程總結

2009年8月29日在基金會會址舉行茶會,與團友們及一群新朋友共同欣賞山西相片,他們對山西未來的植林工程項目非常感興趣。

募款植林

在8月到訪山西後,收到了朋友們的指定捐款植樹,使我們基金會發展未來第三期及完成450畝荒地的植林經費籌劃獲得支持。

莊厚明
2009年9月

Comments Off

May 20 2009

香港力行植林慈善基金会启动山西石楼植树造林工程 - 新华网

Published by bird under 山西, 新聞剪報, 石樓, 項目

新华网 http://news.xinhuanet.com/newscenter/2009-05/03/content_11303995.htm

新华网太原5月3日电(记者孟晨光)香港力行植林慈善基金会日前在山西省吕梁市石楼县四江村举行植树造林工程启动仪式。来自香港力行植林慈善基金会的代表与当地村民、林业局工作人员、中学生一起种下侧柏等涵养水源的树木。

这是香港力行植林慈善基金会自2005年成立以来在石楼县启动的第三批植树造林工程。力行植林慈善基金会山西项目组组长庄厚明医生说:“希望我们在黄土高原这片中华民族文明发源地所做的小小工作能对下一代产生一些影响。”

据了解,该基金会此前已投资120余万元,先后于2007年和2008年在石楼县四江村种植刺槐、国槐、杏树、桑树等各类树木600余亩,以期保持水土、涵养水源、改善生态环境。

1994年,香港麻醉医生谢士恒开始在内地开展植树造林活动,他先后在广东梅县及东山、山西阳曲等地种植水源涵养林数千亩。2005年3月,谢士恒不幸病逝。在他的感召下,香港一批志愿者注册成立力行植林慈善基金会,医生、护士、律师、企业家等不同职业的志愿者本着“身体力行、量力而行”的精神,目前在内地累计植树超过100万株。

No responses yet

May 20 2009

香港力行植林慈善基金会启动山西石楼植树造林工程 - 凤凰资讯

Published by bird under 山西, 新聞剪報, 石樓, 項目

凤凰资讯 http://news.xinhuanet.com/newscenter/2009-05/03/content_11303995.htm

新华网太原5月3日电(记者孟晨光)香港力行植林慈善基金会日前在山西省吕梁市石楼县四江村举行植树造林工程启动仪式。来自香港力行植林慈善基金会的代表与当地村民、林业局工作人员、中学生一起种下侧柏等涵养水源的树木。

这是香港力行植林慈善基金会自2005年成立以来在石楼县启动的第三批植树造林工程。力行植林慈善基金会山西项目组组长庄厚明医生说:“希望我们在黄土高原这片中华民族文明发源地所做的小小工作能对下一代产生一些影响。”

据了解,该基金会此前已投资120余万元,先后于2007年和2008年在石楼县四江村种植刺槐、国槐、杏树、桑树等各类树木600余亩,以期保持水土、涵养水源、改善生态环境。

1994年,香港麻醉医生谢士恒开始在内地开展植树造林活动,他先后在广东梅县及东山、山西阳曲等地种植水源涵养林数千亩。2005年3月,谢士恒 不幸病逝。在他的感召下,香港一批志愿者注册成立力行植林慈善基金会,医生、护士、律师、企业家等不同职业的志愿者本着“身体力行、量力而行”的精神,目 前在内地累计植树超过100万株。

No responses yet

Nov 19 2008

黄土高原造林的有效模式

Published by bird under 山西, 植林, 石樓

——香港力行植林造水慈善基金会石楼四江造林工程的启示

一、石楼县基本情况
(一)自然地理概况
石楼县位于山西省西部,地处吕梁山西麓,黄河中游东岸,吕梁市的南端。其地理位置是东径110022/-111006/,北纬36051/-37016/之间。
本县属于黄河中游黄土高原梁峁丘陵沟壑区。东依吕梁山脉,西靠黄河。地形东高西低,起伏显著。东部风尾山海拨最高2051米;西部黄河滩海拨最低567米;相对高差1484米。全县的地貌特征是沟壑纵横,梁峁起伏,支离破碎,植被稀疏,地表侵蚀严重。
(二)气候条件
本县属于暖温带大陆性季风气候。四季分明,冬长夏短。年平均所温10.2oC,年日照时数2800小时,大于等于10o的积温3209,年平均降水量485mm,多集中在7、8、9三个月。无霜期192天,主要气候灾害是干旱、干热风、冰雹和霜冻。
地表水主要来自大气降水,受降水量和季节的影响很明显,因而水源不稳定。全县河流均属黄河水系,由东向西注入黄河,年均地表水总量为7120万立方米。本县受地形地貌、地质构造及含水岩层控制,地下水资源贫乏,年均仅1386万立方米
(三)土地利用现状
本县国土总面积261.45万亩,其中林业用地142.02万亩,占54.3%;农耕地49.28万亩,占18.9%;牧业用地30.34万亩,占11.6%;其它用地39.81亩,占15.2%。
林业用地中有林地面积39.3万亩,未成林造地58.81万亩,宜林地26.75万亩。森林覆盖率为13.46%,林木覆被率为19.31%,蓄积量为22.5万立方米。
农耕地面积49.28万亩,其中基本农田13.84万亩,占耕地的28.1%;250以上的坡耕地24.42万亩,占农耕地的49.6%,小于250的坡耕地11.02万亩,占农耕地面积的22.3%。
(四)植被及土壤
石楼县境内自然资源丰富植物种类繁杂。常见的乔木有椴树、栎树、桦树、椿树、楸树、杨树、柳树、国槐、刺槐、侧柏、油松、枣 树、核桃、杏树、桃树、苹果、梨树等;灌木类有酸枣、沙棘、黄刺玫、荆条、柠条、丁香、木瓜、山桃、山杏等;草本类有蒿类、羊胡子、狗尾草、白草、禾本科草等;主要的农作物有玉米、谷子、小麦、豆类、薯类及油料等。
全县土壤为灰褐土一个土类,分布为五个亚类,主要是灰褐土性土,占全县总面积的86.2%,其次四个亚类的分布依次为山地灰褐土,粗骨性灰褐土,淋溶性灰褐土,灰褐土。共有十六个土属,30个土种。但主要土种为轻壤黄土质灰褐土性土,占全县国土面积的近50%。
(五)社会经济概况
全县辖4镇5乡134个村民委员会,有人居住的自然村506个。2007年底总户数26546户,农业户22027户,总人口106185人,农业人口92187人,总劳动力32600个。国内生产总值2.5亿万元,工农业总产值18854万元,其中农业总产值11704万元,财政收入3038万元,农民人均纯收入668元,属全国特困县。


二、石楼四江植林造林造水工程概况

香港力行慈善基金会忧黄土高原贫水之苦于2006年11月选定在石楼县灵泉镇四江村开展“植林造水”之实践,2007年一期工程规划面积250亩,投资50万元。其中:坡耕地120亩,刺槐与杏树、国槐与桑树混交;荒坡地130亩,刺槐与榆树、椿树混交;2008年二期工程规划面积385亩,投资75万元。其中坡耕地85亩,国槐与杏树、火炬;火炬与刺槐、山杏、桑树混交;荒坡地300亩,火炬与刺槐、紫穗槐、桑树混交。2008年秋季检查一期工程平均成活率达94%。
三、四江植林造水工程的基本模式
(一)坡耕地。采用等高线大坑(长2m、宽50cm、深50cm)整地,“品”字形排列,坑中心距3m,行距1.5m,每亩150坑,植苗450株。整地时先将表层杂草清除干净,将表层熟土层翻到坑的上边,生土层下翻打塄,然后将稻壳(每坑3公斤)和表层熟土混合回填入坑内。填深40cm,经雨季降水踏实后栽植。栽苗完成后用松树皮覆盖,坑内覆盖厚度2—3cm。
(二)荒坡地。采用等高线水平沟(长度不限,因地确定,宽50cm,深50cm)整地,水平沟行间距2m,植苗株距1m,每亩330株。整地时先将表层杂草清除干净,将表层熟土层上翻到沟的上方,生土下翻做塄,等开沟规格达标后,将稻壳与熟土层混合,并回填入沟,填深40cm。经踏实后栽植。栽苗后用松树皮覆盖苗周,每株树覆盖1公斤。
要点:1、坑要呈“品”字形排列。水平沟要沿等高线开挖,力求水平。以利充分拦蓄地表径流。
2、稻壳与表层熟土混合要均匀。
3、松树皮覆盖要铺严,不外露回填土。
四、模式的针对性
(一)黄土高原植林的限制因子
黄土高原影响植树造林成活率的关键因子是水份,从东到西,从南到北自然降水量逐渐减少,黄河以西以北地区年降水量不达400mm,而且60%的降水量集中在七、八、九三个月,春季栽苗缺水,夏季高温干旱,冬季干燥寒冷,造成苗木成活率低,生长速度慢。其次,黄土高原虽土层深厚,但土壤肥力低,降水下渗严重,也不利于苗木成活和生长。第三蒿类杂草丛生,争肥争水严重,也是影响苗木成活率和生长速度的次要因子之一。
(二)四江模式的针对性
1、大坑、水平沟整地可以充分拦截地表径流,将夏季暴雨,秋季降水蓄积坑内,改善了坑内水份条件,变一二季降水为四季利用。
2、稻壳耐腐烂,且槽形构造,蓄水能力强,另外,使土壤结构变软,改变了土壤的理化性状,利于通气,利于降水下渗,腐烂后提高肥力。
3、松树皮覆盖树周或坑表,减少了地表水份蒸发,改善了坑(沟)内水份状况,同时增加了土壤肥力。
4、适时中耕除草,减少了杂草争水争肥问题。
(三)四江模式效果
四江模式与国家、社会造林工程相比,一次性造林效果与当年生长量有明显差别,据统计资料分析,同年度同地类刺槐造林成活率高出10—15%,新梢生长量高30—50cm。
五、存在的主要问题
根据县国营林场六十年代营造的每亩330株的侧柏林和社会造林密度生长情况看,四江造林密度450株和330株,幼苗期生长良好,但后期可能因为密度过大,水份供应受限,利于郁闭保土成林,不利树木成材。其次,较国家工程单位面积投资大。第三,缺少针叶树种,冬季落叶后,工程效果不明显。

石楼县林业局 文斌
二00八年十一月十八日

08 秋植林全景

08 秋植林一景

08 秋植林條狀坑

No responses yet

Oct 08 2008

2008年10月1日山西視察報告

Published by chia under 山西, 植林

(以下報告涉及金錢數字以人民幣計算)

視察時間
2008年10月1日至10月6日
10月2日視察陽曲縣王文嶺200畝林地林木生長狀況
10月3日及5日視察石樓縣四江村250畝林林木地生長狀況;視察385畝林地整地情況;與石樓林業局商討未來發展。

視察及隨行人員
莊厚明  力行基金會山西總管
Eva Chan施永青基金會總幹事
郭立華  志願者,扶輪社成員
Vicky Lau 志願者

陽曲縣王文嶺情況

  1. 林木生長良好,05年春謝醫生種下的林木約有55-60%存活。
  2. 山西林科院鄺院長詢問是否明年春天補苗。
  3. 因為有蟲害,交予管工方金海3900元除蟲。
  4. 因為通漲,管工方金要求每個月補貼費由500元改為600元。
  5. 由香港新華社王麗麗小姐介紹,山西新華社採訪主任高風委派記者彭洋與基金會同往王文嶺視察。彭對力行基金會的成就印象深刻。他的在新華網山西頻道發了一則報導,並且承諾明年3月12日植樹節到石樓做更深入的報導。(已發報導 http://www.eedu.org.cn/news/region/huabei/sx/200810/29981.html

註:第2與第4件事有待山西小組商議。

石樓縣四江村情況

  1. 太原往石樓的交通已見改善。明年起,由太原經柳林至石樓的高速公路將全線開通,全程約四小時。
  2. 第一期植林:2007年春天與秋天種植的250畝地,林木生長十分良好,平均存活率超過90%,文斌會製圖,用圖來列明哪些地種了哪些樹苗以及它們的存活率。
  3. 第二期植林:2008年春天整地385畝,已經全數整好,打坑、混稻米殼、雞糞之工序合乎要求。因土地使用權證有些許內容需要修改,待改好後再寄交基金會。尚未植林,故無林權證發出。
  4. 在第一期250畝地中,有20-30畝地存活率不佳,原因是那片地原先農民種了用來喂牲口的木蓿和尖草,這些草類的根部蔓延深廣、生命力頑強,怎麼除也除不盡,搶了樹苗生長所需的水份,因此樹苗都不存活。另外,白樺不是本地樹種,試種白樺種子全數死亡。根據上述經驗,凡有木蓿和尖草的土地不宜種樹,任其生長防其蔓延就好。至於樹種,盡量要用本地苗場或野生的樹種,才易存活。
  5. 據觀察,植林後林地下面的河壁有水氣增加現象。水利部知悉力行基金會植生態林,在基金會第一期250畝林地與385畝林地之間的山谷底,築了一個小土壩,欲以此為集水地。
  6. 石樓林業局為了增強基金會植林造水的效果,開始在屈產河支流的另一岸同時闢地植林。林業局與基金會合作,各做屈產河支流的一邊,使河道兩岸成為水源地,增加河道的水量。屈產河是黃河的支流,屈產河水量的增加,不但有利石樓縣的用水,也產生疏濬黃河河道的作用。
  7. 據林業局任局長告知,國家退耕還林補貼,已經由原來的連續補貼八年延長至十六年。基金會可爭取國家補貼,補貼可繼續投入於植林。
  8. 文斌建議,由於今年夏秋雨水充足,樹坑已經有足夠的儲水,故第二期植林之385畝,今年十月底可以落苗。經莊厚明現場觀察,情況屬實,初步決定一半土地落苗(約180畝),另205畝待明年初春落苗。樹苗品種有待文斌盡快報來,大致上將比第一期增加2-3種樹種。
  9. 石樓林業局覺得基金會4月20日在廣東清遠東山舉辦的植樹日非常有意義,提議09年3月12日國家植樹節也在石樓辦一個植樹日,由林業局與基金會合作,邀請當地官員、農民、學生參加。
  10. 交文斌補貼費去年11月至今年10月補貼費9600元。
  11. 文斌告知並照相,最近太原市內植林都用松樹皮做覆蓋。這表示太原市的林業人員認可松樹皮防止水份蒸發和製造人工表土的效用,故採用了松樹皮。

註:第7、第8及第9條有待山西小組商議。

No responses yet

Oct 06 2008

山西“力行”生态林生长状况良好

Published by chia under 山西, 新聞剪報, 植林

Eedu.org.cn 作者:彭洋 资讯来源:新华网 点击数:44    更新时间:2008-10-3

http://www.eedu.org.cn/news/region/huabei/sx/200810/29981.html

10月2日,力行植林慈善基 金会会员庄厚明(右)与当地村民方金海在检查树木的生长状况。

新华社照片,太原,2008年10月3日 新华社记者 彭洋 摄

2005年4月以来,香港力行植林慈善基金会在山西省阳曲县和石楼县分别种植了200亩和1000亩的生态林,目前树木生长状况良 好。2005年成立的香港力行植林慈善基金会,每年投资150多万港元在内地缺水地区从事改善植被的工作,目前已在内地植树180多万株。

10月2日,力行植林慈善基金会会员庄厚明(左)与当地村民方金海在检查树木的生长状况。当地由于缺水很少生长树木,“力行”生态林已在这里成功存活。

新华社照片,太原,2008年10月3日 新华社记者 彭洋 摄

2005年4月以来,香港力行植林慈善基金会在山西省阳曲县和石楼县分别种植了200亩和1000亩的生态林,目前树木生长状况良 好。2005年成立的香港力行植林慈善基金会,每年投资150多万港元在内地缺水地区从事改善植被的工作,目前已在内地植树180多万株。

No responses yet

Sep 09 2008

在黃土高原上的生態林種植 - 山西省 石樓

Published by chia under 山西, 植林, 石樓

石樓 07年種植的苗木生長情況

石樓 08年植林前的整地情況

No responses yet

Next »